The PDU + Rack + Wiring + Transformer Installation Kit is the electrical installation for a mining farm, made of a three-phase PDU, a miner rack / shelving, wiring and a transformer.
- Rack: Bitmain Antrack V1 24kW for 4 hydro miners $623-$653; 12-slot hydro cabinet $2,799 at Global Sources; Bitmain ANTRACK AR31 47U 200kW for 20 hydro miners $20,000.
- Transformer: three-phase 50-100kVA in China $900 (Forui, 220V to 380V) and $2,150 for a dry-type 50/80/100kVA unit, with wide ranges of $160-$580 for step-up autotransformers by type.




